Back to all jobs
Visible on IKONS todayNewPopular

Plan MER Preparer for Heat Programs

LimburgHybrid32 hours/week3-6months

The client, a collaboration of public organizations, is in the process of developing heat programs. This requires an environmental impact assessment (EIA), specifically a plan-environmental impact report (plan-EIA). The assignment involves preparing this joint plan-EIA and guiding the associated EIA process. This also includes processing comments and recommendations from the review advice of the EIA Commission.

The contractor will use the most current Model Report and conduct additional research into relevant neighborhood types, heat alternatives, and location-specific environmental effects. The study is limited to information required at the plan-EIA level to assess environmental effects and differences between heat alternatives.

What you do

  • Prepare a plan-EIA for the heat programs of the client organizations.
  • Guide the EIA process, including processing comments and recommendations from the EIA Commission.
  • Conduct additional research into national neighborhood types, heat alternatives, and location-specific environmental effects.
  • Develop an appropriate classification into neighborhood typologies, taking into account the characteristics of the areas involved.
  • Determine realistic heat alternatives per area in consultation with the organizations involved, including technical applicability and availability of heat sources.
  • Justify and document the selection of alternatives to be investigated in a traceable manner.
  • Fully integrate the advice on scope and level of detail from the EIA Commission.
  • Pay attention to current and future heat and cold demand for at least ten years, including uncertainties.
  • Include the coherence with the energy system, such as grid congestion, grid capacity, peak load, and energy storage.
  • Make transparent how the recommendations of the EIA Commission have been processed.
  • Describe relevant environmental effects, uncertainties, and knowledge gaps for future monitoring and evaluation.
  • Include relevant future developments that may affect the applicability, feasibility, or environmental effects of heat alternatives, including scenario studies for large regional projects.
  • Pay attention to developments outside the planning area, such as geothermal explorations and regional heat supply systems.

What they ask

  • Independently carry out and finalize a plan-EIA for a framework plan or program, including guiding the review by the EIA Commission.
  • Experience with a completed plan-EIA for which the EIA Commission issued a review advice indicating that essential environmental information was present.
  • The reference assignment must have been carried out within three years prior to the application deadline.
  • The proposed project leader has completed at least two plan-EIA projects within five years prior to the application deadline.
  • The project leader was responsible for:
  • Content-related management and coordination of experts.
  • Alignment with the client.
  • Preparation and guidance of the review by the EIA Commission.
  • A realistic and logically structured planning, including milestones and intermediate products.
  • Insight into the main risks foreseen regarding planning and proposed appropriate control measures.

Preferences.

  • Relevant experience of the project team with comparable plan-EIA projects, preferably under the Environmental Act (Omgevingswet).
  • Experience of the project leader with project management.
  • A motivated composition of the project team, including role distribution and coherence between disciplines.
  • Expertise within the team regarding:
  • Current and upcoming legislation and jurisprudence relevant to the study (e.g., Municipal Heat Transition Instruments Act, Collective Heat Act).
  • Ecology and assessment of associated environmental effects.
  • Heat technologies and assessment of associated environmental effects.
  • Geothermal energy and assessment of associated environmental effects.
  • Soil, groundwater, noise, and vibrations and assessment of associated environmental effects.
  • Landscape, archaeology, cultural history, and spatial quality.
  • Environmental safety and assessment of relevant risks of heat sources, installations, and infrastructure.
  • Energy systems and the coherence between heat alternatives, electricity infrastructure, and grid congestion.
  • Additional expertise deemed relevant by the bidder for the execution of the assignment.
  • Description of the planned deployment of the project team during the assignment, including the availability of key personnel and ensuring continuity.

How to apply

View the full assignment text and application details once your tailored application is ready.

Order a tailored application to view the full assignment and application details.

More context, less searching.

You get enough context to judge whether this job is relevant. The full brief, client details and next steps stay available inside the app.